Andylogo.gif (4931 bytes)             blueball1.gif (8972 bytes) Welcome  blueball1.gif (8972 bytes)          Andylogo.gif (4931 bytes)

`where no one has gone before !'

pictures of the  `Beam Line` at UB

This project was created by the

Department of Nuclear  Medicine, State University of New York at Buffalo

for the purpose of solid target irradiation.(In-111,Cu-62,I-124...)

Project Manager And designer: Erol Bars

Engineer support: Phil Orlosky

Mechanical Engineer support :Bob Borshel: Herb Sedita: Walter Parks. 

This installation may lead to production of

long lived radionuclides.

Presently we are developing an electroplated copper target.

Characteristic of the cyclotron are presently :

range of proton energy 14.5MeV to 32.1MeV for 350uA peak to 515uA .

The  beam ratio will be less than 1 % between the stripper and the target station...

-See other Related Targets Projects for F-18 and N-13 Production.

-Recovery Module for F18

New C11 Target (Nemo)

TronTOPUPview.JPG (210560 bytes)

30MeV - Cyclotron (other View)

Psn00001.jpg (198837 bytes)

View of the beam line going into the target vault

PSN00004.JPG (190991 bytes)

Top view of the beam line from the cyclotron vault .

PSN00005.JPG (178574 bytes)Trgroom1.jpg (218545 bytes)Trgroom2.jpg (220803 bytes)

View of the beam line from the target vault.

PSN00008.JPG (52321 bytes)

View of faraday - viewer station from the target vault

PSN00014.JPG (185993 bytes)LASERTRG.JPG (40702 bytes)

Optical viewer from the target station.

7deg trg assembly flp open.jpg (67565 bytes)7deg trg assembly + insert.jpg (51992 bytes)

3 D View Of 7 deg target assembly with Foil isolation chamber Opened.

This is mainly used for In-111 - Cu62 - Co57

The target assembly require no tool for assembly and separation!.

 

oldi124 trg assembly.jpg (83910 bytes) 3 D View Of 37 deg target assembly with Foil isolation chamber Close For Pressure vessel.

This is mainly used for I-124

 

20060412_00074.jpg (28283 bytes)trg_roller_assembly.jpg (81841 bytes)image_00058.jpg (73518 bytes)

Device for Preparation of the solid Target during  Plating .

Thick heavy material is very difficult to achieve without avoiding precipitate plating thus a furbishing system was developed.

as well as brushing during plating also improved the surface and addison quality.

I micro CPU controls the Number of pass, pre-set.

 

SO4-3.jpg (371893 bytes)SO4-9.jpg (340228 bytes)

Close up surface of plating Cd112 .

(Colored picture by computer redering.)

Picture on the left shows result after a furbishing.

View Beam Profile at 25uA under Vacuum (AVI file).

 View Beam Profile at 2.5uA through Havar foil and Helium Chamber (AVI)

Beam Profile at Cu Trg Extreme End Beam Line

Beam Centering X-Y Steering Magnet

Quad-C tuning influence on beam profile

Quad-B influence on beam Profile

Main Coil influence on beam profile

birdmail.gif (17571 bytes)

E-mail me!

                                                                                                                          

Since Projects 11/2/1998

Last time Edited 12/01/2005